Road Light Reconstruction in 2009 - Construction of the Road Construction of the "City in the Village" in the Old District (Baiyun District: No. 2 Section of Junhe Street)


Tender number:-
Tendering Agent: Guangzhou Suijian Engineering Cost Consulting Co., Ltd. Owner: Guangzhou Baiyun District Construction and Municipal Bureau Registration Deadline: 2009-07-17
Area: Guangdong Industry: Water Conservancy Bridge Construction, Energy Chemical, Electrical and Electronic Appliances

Approved according to the document of Sui Jian Ji [2009] No. 548, and the project has the proof of construction drawing review and the certificate of funds, Guangzhou Baiyun District Construction and Municipal Bureau is now on the road lighting renovation project in 2009--Gongzhong Village, Laoliu District, Guangzhou "Street Light Construction (Baiyun District: No. 2 Section of Junhe Street) Project is open for public bidding for construction, and the contractor is selected.
I. Project Name: Road Light Reconstruction Project in 2009 - Construction of Street Lamps in "Chengzhong Village" in Laoliu District, Guangzhou (Baiyun District: No. 2 Section of Junhe Street) Engineering Construction Contractor 2. Tendering Unit: Guangzhou Baiyun District Construction and Municipal Bureau Contact: Feng Gong Telephone Tendering Agency: Guangzhou Suijian Engineering Cost Consulting Co., Ltd. Contact: Chen Gong Telephone Tendering Supervision Agency: Guangzhou Construction Project Tendering Management Office Complaint Telephone 3. Construction Location: Junhe Street, Baiyun District, Guangzhou Project Overview: Most of the design roads of this project are urban roads, streets and lanes, and road lighting projects with a power supply voltage rating of 10KV.
V. Classification of tenders and the contents, scale and estimated price of bidding for each tender:
Division of bids: This project has a bid section;
Contents of the bidding: According to the construction drawings and relevant technical materials provided by the bidding unit, the contracting of the road surface of the project, the connection of the power supply, the cable laying, the installation of the light pole based storage pole, and the installation of lighting equipment are all included.
Scale: Construction and installation of street lighting project with power supply voltage level of 10KV in the second section of Junhe Street in Baiyun District.
Expected to issue the package price: about 9 million.
6. Source of funds: Urban construction fund 7. Time for registration and submission of qualification examination application documents:
Registration start date (including today): July 16, 2009 registration deadline (including today): July 17, 2009 Japan project registration time: morning: 9:00 to 11:30, afternoon: 2:00 ?? 4:00.
If the number of applicants who apply for bidding is too small to form sufficient competition, the tenderee may issue a supplementary notice to confirm the registration time before confirming the formal bidder.
VIII. Application and submission of qualification examination application documents:
Guangzhou Construction Engineering Trading Center (333 Tianrun Road, Tianhe District, Guangzhou)
9. Eligibility requirements for bidders:
1. The bidder’s intention to participate in the bidding is clearly expressed, and the bidder’s representative is authorized to be effective.
2. The bidders are all qualified as independent legal persons and hold the business license of the legal person issued by the administrative department for industry and commerce, and operate according to national laws.
3. The bidders hold the enterprise qualification certificate and safety production license issued by the construction administrative department.
4. The bidder has the qualifications required to undertake the project (one of the following):
(1) City and road lighting engineering professional contracting level 2 (or above);
(2) Three-level (or above) contractor for power transmission and transformation engineering;
(3) Mechanical and electrical equipment installation engineering professional contracting level 2 (or above);
5. The qualifications required by the bidder to be the person in charge of the project (satisfying one of the following):
(1) The bidder intends to be the person in charge of the project as a registered construction engineer of the municipal public works major or above, and holds the project manager safety training assessment certificate (Class B); (Note: the bidder holds the city And road lighting engineering professional contractor level 2 (or above) qualification selection)
(2) The bidder intends to be the person in charge of the project is a registered construction engineer at the first level of mechanical and electrical engineering, and holds the project manager safety training assessment certificate (Class B); (Note: the bidder holds the substation project Professional contracting level 3 (or above) qualification selection)
(3) The bidder intends to be the person in charge of the project as a registered construction engineer of the second or above mechanical and electrical engineering profession, and holds the project manager safety training assessment certificate (Class B); (Note: the bidder holds the mechanical and electrical equipment Install professional contractor level 2 (or above) qualification to choose this)"
Note: The professional and grade standards of the constructor are in accordance with the “Regulations for the Administration of Registered Construction Engineers (Trial)” and “Standards for the Standards of Registered Construction Engineers (Trial)”
6. The bidder has completed the quality-qualified similar project performance in the Guangzhou area since July 1, 2007 (similar projects refer to the lower level of qualification level mentioned in point 4, which can be undertaken by the bidder. Electrical engineering professional contracting three levels of qualification, do not provide similar performance). It is necessary to provide the notice of winning the bid (except for the professional projects subcontracted by the general contractor), the construction contract, the completion acceptance report or the completion acceptance certificate (the construction price is subject to the notice of winning the bid). If the above information cannot prove the technical indicators of the scale of performance (referred to as area, height, span, pipe diameter, etc.), additional information indicating the technical indicators of performance shall be provided.
Note: 1. The notice of winning the bid should be confirmed by the following units: Guangzhou Construction Engineering Trading Center and its branch, former Guangdong Construction Engineering Trading Center, former Guangzhou Construction Engineering Trading Center, and former Guangzhou Panyu District Construction Engineering Trading Center (tender Center), the former Guangzhou City Huadu District Construction Project Tender Management Office, the former Guangzhou Economic and Technological Development Zone Construction Engineering Trading Center, the Conghua City Construction Engineering Trading Center, and the Zengcheng Construction Engineering Trading Center.
2. For the professional project performance of individual bidding, it is necessary to provide the bidding notice, construction contract, completion acceptance report or completion acceptance certificate. The professional project performance subcontracted by the general contractor shall only provide the subcontract, completion acceptance report or completion acceptance certificate.
7. The bidder has signed the stamped applicant's statement in accordance with the contents of Annex III.
8. About the joint bid:
This project does not allow consortium bids.
9. Before the qualification examination, the informant and the informative filing information of the bidder and the person in charge of the project have been published on the Guangzhou City Construction Network.
X. The method for determining the official bidder:
1. If the number of bid applicants who meet the eligibility criteria for qualification examination is more than 5 and less than or equal to 12, all bidders who meet the eligibility requirements for qualification examination shall be the official bidders.
2. When more than 12 bid applicants meet the eligibility criteria for qualification examination, 12 randomly selected will become the official bidders.
3. If the number of bidders who meet the eligibility criteria for qualification examination is less than 5, the bidding will fail. The tenderer analyzes the reasons for the failure of the bidding, amends the bidding plan, and re-organizes the bidding after being reported to the relevant management department for approval.
11. If the tenderer fails to apply for a change in bidding or non-tendering due to two or more bidding failures, the final public bidding shall cancel the qualifications of the bidders at the ninth and 6th points.
12. Accept the registration and qualification examination, and select the best (if any) in accordance with the qualification examination documents (Annex 1).
XIII. According to the “Notice on Forwarding the “Maximum Value Method for the Construction of Bidding and Tendering of Buildings and Municipal Infrastructure Projects” by the Guangdong Provincial Construction Department” (Sui Building [2006] No. 539), the project sets the highest bidding value according to law.
XIV. For details of the information to be submitted when bidding applicants are required to register, please refer to Appendix 2, “List of Bidder Applicants for Filing and Submitting Materials”. (One copy, one copy of the original, if the original and the copy are inconsistent, the original shall prevail) The validity period of all the promised expressions stated in the application documents of the bidding applicant shall be not less than 60 days. The information submitted in the “List of Bidder Applicants for Filing of Filings” is not required to be submitted, and is not qualified as a failed audit. in accordance with. If the official bidder is determined by the preferential method, the information used in the selection of the bidder shall be marked as “preferred information” in the “List of Bidder Applicants for Filing and Submitting Information”. If the bid applicant does not submit this part of the information, it will not be deemed as unqualified, but will Affect the preferred outcome of the bid applicant.
15. The bidder shall send the legal representative or its authorized representative to participate in the Balling Club on time, and the Ballet will be witnessed under the witness of the Guangzhou Construction Engineering Trading Center. The specific time will be notified in writing.
16. The bidding unit may sign a complaint with the bidding supervision agency of this bidding for any illegal and unfair content in this announcement and the bidding documents.
17. The tender notice document and the bidding documents use the GZZB200612-015-1 bidding document template. The differences between this announcement and the contents of the template are underlined. All underlined parts are part of this announcement and have the same effect as other parts.